The average time required for air conditioner installation in Malaysia depends on several factors, including the type of air conditioner, complexity of the setup, and the condition of the installation site. Here's a detailed breakdown:
Wall-Mounted Split Units (Most Common):
Time Required: 2–4 hours
Details: Installation involves mounting the indoor and outdoor units, connecting refrigerant lines, wiring, and testing. This is the most common type of air conditioner in Malaysia, particularly for homes and small offices.
Ceiling Cassette Units:
Time Required: 4–6 hours
Details: Requires more time due to the need to fit the unit into the ceiling and manage additional ductwork or piping.
Centralized Air Conditioning:
Time Required: 1–2 days (or more)
Details: Installation is more complex, involving ductwork, zoning systems, and extensive wiring. This is more common in large buildings or commercial setups.
Pre-existing Infrastructure:
If there are pre-installed brackets, piping, or wiring, the installation is quicker.
For new installations, technicians need additional time to drill walls and install supports.
Complexity of Piping and Wiring:
Longer distances between the indoor and outdoor units increase installation time.
Routing pipes and wires through walls, ceilings, or tight spaces requires more effort.
Access to Installation Site:
Installing the outdoor unit on high-rise buildings or hard-to-reach locations takes additional time due to safety precautions.
Number of Units:
Installing multiple air conditioners simultaneously can take 1–2 hours extra per additional unit.
Weather Conditions:
Heavy rain, common in Malaysia, can delay installation, particularly for outdoor units.
Technician Expertise:
Experienced technicians can complete installations more efficiently compared to less experienced teams.
Extra Features:
Installing features like WiFi controls or additional air purification systems may add 30 minutes to an hour.
Site Preparation (30–60 minutes):
Inspecting the installation site and ensuring it meets requirements.
Preparing tools and materials.
Indoor Unit Installation (1–2 hours):
Mounting the indoor unit and securing it to the wall.
Connecting the refrigerant lines, drain pipes, and electrical wiring.
Outdoor Unit Installation (1–2 hours):
Positioning and securing the outdoor unit.
Connecting refrigerant lines and electrical wiring to the indoor unit.
Testing and Finishing (30 minutes):
Checking refrigerant levels, ensuring proper operation, and testing the system for leaks.
Cleaning up the site and providing the customer with usage instructions.
P.S. Do you require assistance servicing your air conditioner? The Aircond service company you can trust is us! Our aircond specialist has years of experience and can provide you with the professional air conditioner service repair
Chemical Cleaning:
If a chemical cleaning is needed before installation, it can add an extra 30–60 minutes.
Old Unit Removal:
Removing an existing air conditioner can take 30 minutes to 1 hour.
Electrical Modifications:
Adding a dedicated power outlet or upgrading wiring can add 1–2 hours.
While some installers may offer a quick installation to save time, a thorough and professional installation ensures:
Proper sealing of refrigerant lines to prevent leaks.
Secure mounting of units to avoid future issues.
Optimal system performance and efficiency.
Related post: What are the most common air conditioner problems reported in Malaysia?
On average, air conditioner installation in Malaysia takes 2–4 hours for wall-mounted split units, with variations depending on the factors mentioned. To ensure a smooth and timely installation, it’s important to hire experienced and reputable technicians, communicate your requirements clearly, and prepare the site in advance.